{"id":1644,"date":"2024-02-14T00:00:00","date_gmt":"2024-02-13T23:00:00","guid":{"rendered":"https:\/\/lenergeticawp.utrans.global\/actualitat\/we-reduce-the-cost-of-water-with-solar-energy\/"},"modified":"2024-02-14T00:00:00","modified_gmt":"2024-02-13T23:00:00","slug":"we-reduce-the-cost-of-water-with-solar-energy","status":"publish","type":"post","link":"https:\/\/lenergeticawp.utrans.global\/en\/actualitat\/we-reduce-the-cost-of-water-with-solar-energy\/","title":{"rendered":"We reduce the cost of water with solar energy"},"content":{"rendered":"\n<p>L\u2019Energ\u00e8tica, a public energy company, is <strong>accelerating the deployment of photovoltaic panels<\/strong> in potable water generation infrastructures of the Generalitat, such as <strong>treatment plants (ETAP), wastewater treatment plants (ED\/EDAR), desalination plants (ITAM), and reservoirs.<\/strong><\/p><p>In 2024, with the emergency due to drought as the main reason, <strong>these panels will allow us to double the capacity for generating clean energy<\/strong> which, in turn, supplies the water infrastructures with the electricity necessary to treat and produce potable water.<\/p><p>According to estimates, supplying these infrastructures <strong>through self-consumption produces a 30% savings<\/strong> on the electricity bill throughout the useful life of the installation. For this reason, producing our own energy in the same facilities <strong>reduces the dependence of the Catalan water sector on fluctuations in the energy market<\/strong> and increases the capacity for water treatment.<\/p><p>Currently, there are already <strong>10 of these solar installations in operation with a power of 8.235 MW<\/strong>, which corresponds to approximately 9,488 MWh per year. All these panels are already managed by L\u2019Energ\u00e8tica.<\/p><p><img decoding=\"async\" src=\"https:\/\/lenergetica.cat\/uploads\/wysiwyg\/infografia-article1.png\"><\/p><p>In addition to these, we also manage a hydroelectric installation with a power of 1.964 MW, which achieves an individual production of <strong>about 9,500 MWh annually<\/strong>.<\/p><p><strong>Upcoming installations<\/strong><\/p><p>The initial production <strong>will therefore double in 2024<\/strong> with the commissioning by <strong>L\u2019Energ\u00e8tica and Infrastructure of Catalonia<\/strong> of photovoltaic panels in these locations:<\/p><p>&nbsp;<\/p><p><img decoding=\"async\" src=\"https:\/\/lenergetica.cat\/uploads\/wysiwyg\/captura-de-pantalla-2024-02-22-a-les-41329-p-m.png\"><br>&nbsp;<\/p><p>These investments are <strong>additional to the renewable installation plan at the EDAR<\/strong> of the Catalan Water Agency, which plans to invest 159 million euros over 10 years in photovoltaic energy installations, biogas production, and <strong>improvements in the efficiency of treatment plants<\/strong>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>L\u2019Energ\u00e8tica, a public energy company, is accelerating the deployment of photovoltaic panels in potable water generation infrastructures of the Generalitat, such as treatment plants (ETAP), wastewater treatment plants (ED\/EDAR), desalination plants (ITAM), and reservoirs. In 2024, with the emergency due to drought as the main reason, these panels will allow us to double the capacity [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1645,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[41],"tags":[],"class_list":["post-1644","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects"],"acf":[],"uagb_featured_image_src":{"full":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/4B0AC01E-EB04-656A-4436-BA4DA6EE4885.webp",1024,576,false],"thumbnail":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/4B0AC01E-EB04-656A-4436-BA4DA6EE4885-150x150.webp",150,150,true],"medium":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/4B0AC01E-EB04-656A-4436-BA4DA6EE4885-300x169.webp",300,169,true],"medium_large":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/4B0AC01E-EB04-656A-4436-BA4DA6EE4885-768x432.webp",768,432,true],"large":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/4B0AC01E-EB04-656A-4436-BA4DA6EE4885.webp",960,540,false],"1536x1536":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/4B0AC01E-EB04-656A-4436-BA4DA6EE4885.webp",1024,576,false],"2048x2048":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/4B0AC01E-EB04-656A-4436-BA4DA6EE4885.webp",1024,576,false],"gform-image-choice-sm":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/4B0AC01E-EB04-656A-4436-BA4DA6EE4885.webp",300,169,false],"gform-image-choice-md":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/4B0AC01E-EB04-656A-4436-BA4DA6EE4885.webp",400,225,false],"gform-image-choice-lg":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/4B0AC01E-EB04-656A-4436-BA4DA6EE4885.webp",600,338,false]},"uagb_author_info":{"display_name":"Utrans","author_link":"https:\/\/lenergeticawp.utrans.global\/en\/actualitat\/author\/utrans\/"},"uagb_comment_info":0,"uagb_excerpt":"L\u2019Energ\u00e8tica, a public energy company, is accelerating the deployment of photovoltaic panels in potable water generation infrastructures of the Generalitat, such as treatment plants (ETAP), wastewater treatment plants (ED\/EDAR), desalination plants (ITAM), and reservoirs. In 2024, with the emergency due to drought as the main reason, these panels will allow us to double the capacity&hellip;","_links":{"self":[{"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/posts\/1644","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/comments?post=1644"}],"version-history":[{"count":0,"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/posts\/1644\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/media\/1645"}],"wp:attachment":[{"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/media?parent=1644"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/categories?post=1644"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/tags?post=1644"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}