{"id":1660,"date":"2024-07-10T00:00:00","date_gmt":"2024-07-09T22:00:00","guid":{"rendered":"https:\/\/lenergeticawp.utrans.global\/actualitat\/the-president-aragones-and-the-councilor-mascort-visit-lenergetica\/"},"modified":"2024-07-10T00:00:00","modified_gmt":"2024-07-09T22:00:00","slug":"the-president-aragones-and-the-councilor-mascort-visit-lenergetica","status":"publish","type":"post","link":"https:\/\/lenergeticawp.utrans.global\/en\/actualitat\/the-president-aragones-and-the-councilor-mascort-visit-lenergetica\/","title":{"rendered":"The president Aragon\u00e8s and the councilor Mascort visit L\u2019Energ\u00e8tica"},"content":{"rendered":"\n<p>The President of the Government of Catalonia, Pere Aragon\u00e8s, and the Councilor for Climate Action, Food and Rural Agenda, David Mascort, visited today the headquarters of L\u2019Energ\u00e8tica, accompanied by the Secretary for Climate Action, Anna Barnadas; the General Director of Energy, Assumpta Ferran; and the Director of the Catalan Energy Institute, Marta Morera.<\/p><p>During the visit, during which they were accompanied by the management team of L\u2019Energ\u00e8tica, led by the president, Ferran \u00c7ivit, and the general director, Daniel P\u00e9rez; the delegation was able to learn about our facilities, our team, and their daily work to expand the generation of renewable energy, supply the public services of the Government of Catalonia, and achieve the goal of being completely neutral in CO2 emissions by 2040.<\/p><p>In this sense, during the visit we highlighted that our technical team has been committed for months to installing solar panels on the 1,400 suitable roofs of government buildings, where we have already installed 6 megawatts of capacity and will finish the year accumulating more than fifteen, on over one hundred roofs, especially in high schools.<\/p><p>Additionally, in a meeting with the Management Committee, other projects being carried out by L\u2019Energ\u00e8tica were presented, apart from the roofs, where we are working on the ground to generate electricity from solar, wind, and hydraulic energy. Two projects were highlighted: on one hand, the public call process currently open to acquire solar parks of up to 5 megawatts, to which we will allocate up to 10 million euros. On the other hand, the start of operations of the first hydropower plant, the Can Trinxet on the Ter River, starting July 31.<\/p><p>This step will be the first for power plants to pass into public hands as their concessions expire, and it will be added to the energy already generated by the rooftop panels, the stakes in wind farms, and other renewable assets, which total 19 MW of capacity. With this green energy, L\u2019Energ\u00e8tica currently supplies about a thousand supply points in the public sector, and we expect to reach 3,000 by January 2025.<\/p><p>At the end of the visit, President Aragon\u00e8s emphasized that L\u2019Energ\u00e8tica is \u201ckey for our country\u2019s transition to a fully sustainable and 100% renewable energy model, but it is also a key project to promote our country\u2019s energy sovereignty, strengthen the public sector, and understand that governments must have an active role in markets, especially in electricity.\u201d<\/p><p>For his part, Councilor Mascort added that L\u2019Energ\u00e8tica \u201cis a key tool to empower citizens in such a competitive market and in the hands of oligopolies, such as the electricity market.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The President of the Government of Catalonia, Pere Aragon\u00e8s, and the Councilor for Climate Action, Food and Rural Agenda, David Mascort, visited today the headquarters of L\u2019Energ\u00e8tica, accompanied by the Secretary for Climate Action, Anna Barnadas; the General Director of Energy, Assumpta Ferran; and the Director of the Catalan Energy Institute, Marta Morera. During the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1661,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[41],"tags":[],"class_list":["post-1660","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects"],"acf":[],"uagb_featured_image_src":{"full":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/96B1BA03-BDCB-780C-D472-84C4CF625E94.jpeg",1992,1328,false],"thumbnail":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/96B1BA03-BDCB-780C-D472-84C4CF625E94-150x150.jpeg",150,150,true],"medium":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/96B1BA03-BDCB-780C-D472-84C4CF625E94-300x200.jpeg",300,200,true],"medium_large":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/96B1BA03-BDCB-780C-D472-84C4CF625E94-768x512.jpeg",768,512,true],"large":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/96B1BA03-BDCB-780C-D472-84C4CF625E94-1024x683.jpeg",960,640,true],"1536x1536":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/96B1BA03-BDCB-780C-D472-84C4CF625E94-1536x1024.jpeg",1536,1024,true],"2048x2048":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/96B1BA03-BDCB-780C-D472-84C4CF625E94.jpeg",1992,1328,false],"gform-image-choice-sm":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/96B1BA03-BDCB-780C-D472-84C4CF625E94.jpeg",300,200,false],"gform-image-choice-md":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/96B1BA03-BDCB-780C-D472-84C4CF625E94.jpeg",400,267,false],"gform-image-choice-lg":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/96B1BA03-BDCB-780C-D472-84C4CF625E94.jpeg",600,400,false]},"uagb_author_info":{"display_name":"Utrans","author_link":"https:\/\/lenergeticawp.utrans.global\/en\/actualitat\/author\/utrans\/"},"uagb_comment_info":0,"uagb_excerpt":"The President of the Government of Catalonia, Pere Aragon\u00e8s, and the Councilor for Climate Action, Food and Rural Agenda, David Mascort, visited today the headquarters of L\u2019Energ\u00e8tica, accompanied by the Secretary for Climate Action, Anna Barnadas; the General Director of Energy, Assumpta Ferran; and the Director of the Catalan Energy Institute, Marta Morera. During the&hellip;","_links":{"self":[{"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/posts\/1660","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/comments?post=1660"}],"version-history":[{"count":0,"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/posts\/1660\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/media\/1661"}],"wp:attachment":[{"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/media?parent=1660"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/categories?post=1660"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/tags?post=1660"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}