{"id":1668,"date":"2024-12-27T00:00:00","date_gmt":"2024-12-26T23:00:00","guid":{"rendered":"https:\/\/lenergeticawp.utrans.global\/actualitat\/lenergetica-launches-its-first-solar-park-in-vidreres\/"},"modified":"2024-12-27T00:00:00","modified_gmt":"2024-12-26T23:00:00","slug":"lenergetica-launches-its-first-solar-park-in-vidreres","status":"publish","type":"post","link":"https:\/\/lenergeticawp.utrans.global\/en\/actualitat\/lenergetica-launches-its-first-solar-park-in-vidreres\/","title":{"rendered":"L&#8217;Energ\u00e8tica launches its first solar park in Vidreres"},"content":{"rendered":"\n<p><strong>L&#8217;Energ\u00e8tica has celebrated the official opening of its first solar plant<\/strong>. The photovoltaic park, located in Vidreres (la Selva), has a power of 3.4 megawatts peak (MWp) and was acquired through a public call for project purchases made in July, with a total investment of 2.9 million euros.<\/p><p>This solar park is <strong>the largest photovoltaic installation in the Girona region<\/strong> and will generate 6.21 gigawatt hours (GWh) of energy annually, which will be used to supply the desalination plant of ATL in Tordera. With a <strong>total area of 2.36 hectares, the park has 4,872 solar panels of 695 Wp each<\/strong> and occupies the space of an old abandoned motocross track, located near the C-35 highway in the municipality. The project was developed by the Catalan company <strong>Prime Rubau Energy (Prenergy)<\/strong>.<\/p><p>The public call process carried out by L&#8217;Energ\u00e8tica also allowed the preselection of a <strong>45% stake in the Sol del Bages photovoltaic plant<\/strong>, located in Sant Fruit\u00f3s de Bages, with a capacity of 2.94 MWp. This operation is in the final phase before formalizing the purchase.<\/p><p>The visit to the solar park in Vidreres was attended by the Minister of Territory, Housing and Ecological Transition, <strong>S\u00edlvia Paneque<\/strong>; the mayor of Vidreres, <strong>Jordi Camps<\/strong>; the director of L&#8217;Energ\u00e8tica, <strong>Daniel P\u00e9rez<\/strong>; the general director of Environmental Policies and Natural Environment, Marc Vilahur; the director of the Catalan Institute of Energy, Marta Morera; the director of ATL, David Vila; the director of Endesa in Catalonia, Enric Braz\u00eds; and representatives of <strong>Prenergy<\/strong>. During the event, Daniel P\u00e9rez announced that L&#8217;Energ\u00e8tica plans to implement a <strong>park naturalization plan<\/strong> to promote the biodiversity of the area. Additionally, the Generalitat&#8217;s company is preparing <strong>a new public call to acquire other renewable installations<\/strong> this coming year with the aim of increasing the green production capacity of the Generalitat and advancing the decarbonization of public services.<\/p><figure class=\"image\"><img decoding=\"async\" src=\"https:\/\/lenergetica.cat\/storage\/photos\/3\/foto.jpg\"><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>L&#8217;Energ\u00e8tica has celebrated the official opening of its first solar plant. The photovoltaic park, located in Vidreres (la Selva), has a power of 3.4 megawatts peak (MWp) and was acquired through a public call for project purchases made in July, with a total investment of 2.9 million euros. This solar park is the largest photovoltaic [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1669,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[41],"tags":[],"class_list":["post-1668","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects"],"acf":[],"uagb_featured_image_src":{"full":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/11\/4b480dae800087879e6c1dbb4a64eb53.jpeg",329,216,false],"thumbnail":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/11\/4b480dae800087879e6c1dbb4a64eb53-150x150.jpeg",150,150,true],"medium":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/11\/4b480dae800087879e6c1dbb4a64eb53-300x197.jpeg",300,197,true],"medium_large":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/11\/4b480dae800087879e6c1dbb4a64eb53.jpeg",329,216,false],"large":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/11\/4b480dae800087879e6c1dbb4a64eb53.jpeg",329,216,false],"1536x1536":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/11\/4b480dae800087879e6c1dbb4a64eb53.jpeg",329,216,false],"2048x2048":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/11\/4b480dae800087879e6c1dbb4a64eb53.jpeg",329,216,false],"gform-image-choice-sm":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/11\/4b480dae800087879e6c1dbb4a64eb53.jpeg",300,197,false],"gform-image-choice-md":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/11\/4b480dae800087879e6c1dbb4a64eb53.jpeg",329,216,false],"gform-image-choice-lg":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/11\/4b480dae800087879e6c1dbb4a64eb53.jpeg",329,216,false]},"uagb_author_info":{"display_name":"Utrans","author_link":"https:\/\/lenergeticawp.utrans.global\/en\/actualitat\/author\/utrans\/"},"uagb_comment_info":0,"uagb_excerpt":"L&#8217;Energ\u00e8tica has celebrated the official opening of its first solar plant. The photovoltaic park, located in Vidreres (la Selva), has a power of 3.4 megawatts peak (MWp) and was acquired through a public call for project purchases made in July, with a total investment of 2.9 million euros. This solar park is the largest photovoltaic&hellip;","_links":{"self":[{"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/posts\/1668","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/comments?post=1668"}],"version-history":[{"count":0,"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/posts\/1668\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/media\/1669"}],"wp:attachment":[{"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/media?parent=1668"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/categories?post=1668"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/tags?post=1668"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}