{"id":1708,"date":"2025-06-12T00:00:00","date_gmt":"2025-06-11T22:00:00","guid":{"rendered":"https:\/\/lenergeticawp.utrans.global\/actualitat\/what-is-and-what-is-not-a-solar-macro-park\/"},"modified":"2025-06-12T00:00:00","modified_gmt":"2025-06-11T22:00:00","slug":"what-is-and-what-is-not-a-solar-macro-park","status":"publish","type":"post","link":"https:\/\/lenergeticawp.utrans.global\/en\/actualitat\/what-is-and-what-is-not-a-solar-macro-park\/","title":{"rendered":"What is &#8211; and what is not &#8211; a solar macro-park?"},"content":{"rendered":"\n<p>In recent years, the term <i><strong>solar macro-park<\/strong><\/i> has gained significant attention in the public debate about energy transition. It is often used to describe any photovoltaic plant that occupies a considerable area, regardless of its actual power or specific extent.&nbsp;<\/p><p>This lack of precision has generated confusion and discussions, as <strong>neither in Catalonia nor at the state or international level exists a clear official definition<\/strong> of what exactly a macro-park is. If we refer to the regulations, the power of a park (measured in megawatts, MW) determines how it should be processed. Thus, while a park of less than 5 MW follows a fast-track procedure; larger ones must undergo a more complex processing that takes twice as long to obtain authorization. And while projects of up to 50 MW are authorized by the General Directorate of Energy of the Government of Catalonia, those with higher powers go through the Ministry for Ecological Transition and the Demographic Challenge.<\/p><p>To more accurately dimension this concept of <i>macro-park<\/i>, it is useful to <strong>compare the scale of the main solar parks in Catalonia with the largest benchmarks<\/strong> in the State and the world. Only through an objective comparison can we truly understand the meaning of this expression.<\/p><h3><strong>Solar parks in Catalonia<\/strong><\/h3><p>All photovoltaic plants currently operating in Catalonia occupy <strong>areas below 20 hectares<\/strong>, and the largest ones range <strong>between 15 and 4 megawatts (MW) of power<\/strong>. According to data collected by the Ministry for Ecological Transition, the five largest solar parks in Catalonia are:<\/p><ol><li><strong>Constant\u00ed-42<\/strong> (Constant\u00ed, Tarragon\u00e8s), with <strong>17.46 hectares&nbsp;<\/strong>of space and <strong>14.63 MW<\/strong> of power.<\/li><li><strong>Mas Roig I<\/strong> (Castelldans, Garrigues), with <strong>12.15 hectares<\/strong> of space and <strong>5.4 MW<\/strong> of power.<\/li><li><strong>Parsosy Las Teclas<\/strong> (Torregrossa, Pla d\u2019Urgell), with <strong>15.50 hectares&nbsp;<\/strong>of space and <strong>4.95 MW&nbsp;<\/strong>of power.<\/li><li><strong>Parsosy Las Solanas<\/strong> (Ol\u00e8rdola, Alt Pened\u00e8s), with <strong>7.90 hectares<\/strong> of space and <strong>4.95 MW<\/strong> of power.<\/li><li><strong>Cervera 1<\/strong> (Cervera, Segarra), with <strong>7.40 hectares<\/strong> of space and <strong>4.2 MW<\/strong> of power.<\/li><\/ol><p>These are installations with very moderate dimensions and adapt to a model technically known as <strong>distributed generation<\/strong>, that is: small or medium plants, close to consumption points, usually located on soils already altered by human activity, and that seek a harmonious integration with the territory.<\/p><h3><strong>The large plants in Spain<\/strong><\/h3><p>The situation in Catalonia contrasts with that of the whole state, where according to Unef data from 2023, of the 1,013 operational photovoltaic installations, 308 had more than 20 MW of power. If we look at it in terms of renewable power, of the 19,000 MW installed in Spain, 84% are in solar parks of more than 20 MW. In Spain, there are 18 parks of over 50 MW, which account for 21% of the state&#8217;s photovoltaic power. In contrast, only 16% of the power comes from smaller projects under 20 MW, and only 6% have less than 5 MW.<\/p><p>Thus, when we move outside the Catalan context, the figures change radically. Some of the <a href=\"https:\/\/alusinsolar.com\/las-5-mayores-plantas-fotovoltaicas-espana\/\"><strong>most important solar parks in the State<\/strong><\/a> have powers that multiply by tens those of Catalonia. Among them stand out:<\/p><ol><li><strong>Francisco Pizarro<\/strong> (C\u00e1ceres), with approximately <strong>1,300 hectares<\/strong> of space and <strong>590 MW<\/strong> of power.<\/li><li><strong>N\u00fa\u00f1ez de Balboa<\/strong> (Badajoz), with nearly <strong>1,000 hectares<\/strong> of space and <strong>500 MW<\/strong> of power.<\/li><li><strong>Mula<\/strong> (Murcia), with almost <strong>1,000 hectares<\/strong> of space and <strong>494 MW&nbsp;<\/strong>of power.<\/li><li><strong>Talayuela Solar<\/strong> (C\u00e1ceres), with <strong>820 hectares&nbsp;<\/strong>of space and <strong>300 MW<\/strong> of power.<\/li><li>Complex of <strong>Cabrera Solar<\/strong> (Sevilla), consisting of four plants that occupy a total area of about <strong>400 hectares<\/strong> and offer a total power of <strong>200 MW<\/strong>.<\/li><\/ol><p>In this case, we are talking about installations that have much higher powers and also occupy thousands and hundreds of hectares. Although there is no official threshold that defines what a macro-park is, in the Spanish energy sector, <strong>it is common to use this term to refer to projects of this size<\/strong>.<\/p><h3><strong>The great solar giants of the planet<\/strong><\/h3><p>Globally, the concept of photovoltaic macro-park takes on a new dimension.&nbsp;<a href=\"https:\/\/www.power-technology.com\/news\/china-5gw-solar-farm-xinjiang\">According to the latest news<\/a>, these are the main solar complexes operating in the world, all located in Asia:<\/p><ol><li><strong>Xinjiang<\/strong> (China), with about <strong>81,000 hectares<\/strong> of space \u2014the same area as the city of New York\u2014 and <strong>5,000 MW<\/strong> of power.<\/li><li><strong>Jinchuan<\/strong> (China), with <strong>9,000 hectares<\/strong> of space and <strong>1,030 MW&nbsp;<\/strong>of power.<\/li><li><strong>Mohammed bin Rashid Al Maktoum&nbsp;<\/strong>(United Arab Emirates), with <strong>7,700 hectares<\/strong> of space and <strong>2,620 MW&nbsp;<\/strong>of power.<\/li><li><strong>Bhadla<\/strong> (India), with <strong>5,660 hectares&nbsp;<\/strong>of space and <strong>2,700 MW<\/strong> of power.<\/li><li><strong>Pavagada&nbsp;<\/strong>(India), with <strong>5,260 hectares<\/strong> of space and <strong>2,050 MW<\/strong> of power.<\/li><\/ol><p>These mega-parks are capable of supplying electricity to millions of households, all covering areas comparable to those of large cities and exceeding by several orders of magnitude any project in Catalan or Spanish fields.<\/p><h3><strong>The importance of speaking with precision<\/strong><\/h3><p>Considering this context, it is clear that <strong>the majority of Catalan projects can hardly be considered macro-parks in the strict sense<\/strong>.<\/p><p>This linguistic rigor is not minor: using words correctly helps to better understand the real impacts of each installation, <strong>avoids misunderstandings and allows for a more informed public debate<\/strong> focused on the data.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In recent years, the term solar macro-park has gained significant attention in the public debate about energy transition. It is often used to describe any photovoltaic plant that occupies a considerable area, regardless of its actual power or specific extent.&nbsp; This lack of precision has generated confusion and discussions, as neither in Catalonia nor at [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1709,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[41],"tags":[],"class_list":["post-1708","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects"],"acf":[],"uagb_featured_image_src":{"full":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/31747250b1a1a28e2b0be220b8c8dc6b.jpeg",329,216,false],"thumbnail":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/31747250b1a1a28e2b0be220b8c8dc6b-150x150.jpeg",150,150,true],"medium":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/31747250b1a1a28e2b0be220b8c8dc6b-300x197.jpeg",300,197,true],"medium_large":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/31747250b1a1a28e2b0be220b8c8dc6b.jpeg",329,216,false],"large":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/31747250b1a1a28e2b0be220b8c8dc6b.jpeg",329,216,false],"1536x1536":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/31747250b1a1a28e2b0be220b8c8dc6b.jpeg",329,216,false],"2048x2048":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/31747250b1a1a28e2b0be220b8c8dc6b.jpeg",329,216,false],"gform-image-choice-sm":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/31747250b1a1a28e2b0be220b8c8dc6b.jpeg",300,197,false],"gform-image-choice-md":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/31747250b1a1a28e2b0be220b8c8dc6b.jpeg",329,216,false],"gform-image-choice-lg":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/31747250b1a1a28e2b0be220b8c8dc6b.jpeg",329,216,false]},"uagb_author_info":{"display_name":"Utrans","author_link":"https:\/\/lenergeticawp.utrans.global\/en\/actualitat\/author\/utrans\/"},"uagb_comment_info":0,"uagb_excerpt":"In recent years, the term solar macro-park has gained significant attention in the public debate about energy transition. It is often used to describe any photovoltaic plant that occupies a considerable area, regardless of its actual power or specific extent.&nbsp; This lack of precision has generated confusion and discussions, as neither in Catalonia nor at&hellip;","_links":{"self":[{"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/posts\/1708","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/comments?post=1708"}],"version-history":[{"count":0,"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/posts\/1708\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/media\/1709"}],"wp:attachment":[{"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/media?parent=1708"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/categories?post=1708"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lenergeticawp.utrans.global\/en\/wp-json\/wp\/v2\/tags?post=1708"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}