{"id":1527,"date":"2025-01-15T00:00:00","date_gmt":"2025-01-14T23:00:00","guid":{"rendered":"https:\/\/lenergeticawp.utrans.global\/actualitat\/lenergetica-alcanza-los-4000-puntos-de-suministro\/"},"modified":"2025-01-15T00:00:00","modified_gmt":"2025-01-14T23:00:00","slug":"lenergetica-alcanza-los-4000-puntos-de-suministro","status":"publish","type":"post","link":"https:\/\/lenergeticawp.utrans.global\/es\/actualitat\/lenergetica-alcanza-los-4000-puntos-de-suministro\/","title":{"rendered":"L\u2019Energ\u00e8tica alcanza los 4.000 puntos de suministro."},"content":{"rendered":"\n<p><strong>La empresa p\u00fablica de renovables ya abastece a todos los Departamentos de la Generalitat.<\/strong><\/p><p>La compa\u00f1\u00eda prev\u00e9 <strong>multiplicar por diez la energ\u00eda suministrada a la Administraci\u00f3n este a\u00f1o.<\/strong><\/p><p>L\u2019Energ\u00e8tica empieza el a\u00f1o <strong>alcanzando los 4.000 puntos de suministro gestionados en el conjunto de la Administraci\u00f3n<\/strong>, con la incorporaci\u00f3n de todos los Departamentos de la Generalitat de Catalu\u00f1a a su cartera de usuarios. En concreto, la empresa de renovables alcanza este primer trimestre de 2025 los 4.004 puntos suministrados, multiplicando por cuatro los 1.000 que abastec\u00eda el a\u00f1o pasado y superando el objetivo inicial de 3.000 puntos con el cambio de a\u00f1o. Con este aumento en el n\u00famero de consumidores, L\u2019Energ\u00e8tica prev\u00e9 un incremento de la energ\u00eda suministrada que multiplicar\u00e1 por diez la del a\u00f1o pasado, pasando de 55 gigavatios hora (GWh) en 2024 a 500 GWh en 2025.<\/p><p>El mayor consumidor de L\u2019Energ\u00e8tica es Ifercat (Infraestructures Ferrovi\u00e0ries de Catalunya), con un consumo anual de 97,3 GWh de energ\u00eda para abastecer las l\u00edneas 9 y 10 del metro de Barcelona. Este a\u00f1o se han incorporado como usuarios el Departamento de Justicia, con 88,1 GWh para los centros penitenciaris y las oficinas judiciales; medio millar de institutos y otros centros educativos, con 37,4 GWh; la Direcci\u00f3n General de Polic\u00eda, con 36,8 GWh para las comisar\u00edas de Mossos d\u2019Esquadra; el Departamento de Territorio, Vivienda y Transici\u00f3n Ecol\u00f3gica, con 26,4 GWh; y el Departamento de Derechos Sociales e Inclusi\u00f3n, con 19,7 GWh.<\/p><p>Los datos los ha anunciado el director general de L\u2019Energ\u00e8tica, Daniel P\u00e9rez, en una <strong>comparecencia en la Comisi\u00f3n de Transici\u00f3n Ecol\u00f3gica del Parlamento de Catalu\u00f1a.<\/strong> Tambi\u00e9n ha concretado que, una vez cubierta toda la Administraci\u00f3n de la Generalitat, L\u2019Energ\u00e8tica ha avanzado tambi\u00e9n en el suministro de energ\u00eda limpia a las entidades de su sector p\u00fablico, con la incorporaci\u00f3n como usuarios de Salut Sant Joan de Reus, con un consumo anual de 19,2 GWh, y la Corporaci\u00f3 Catalana de Mitjans Audiovisuals, con 13,8 GWh, adem\u00e1s de la propia Ifercat. A lo largo de este a\u00f1o tambi\u00e9n se prev\u00e9 abastecer las infraestructuras de ATL (Ens d\u2019Abastament d\u2019Aigua Ter-Llobregat) y, el pr\u00f3ximo a\u00f1o, m\u00e1s equipamientos sanitarios del sistema p\u00fablico.<\/p><p>En la comparecencia, Daniel P\u00e9rez tambi\u00e9n ha explicado los proyectos de generaci\u00f3n que L\u2019Energ\u00e8tica tiene en marcha, que actualmente incluyen la instalaci\u00f3n de 265 proyectos en tejados que a\u00f1adir\u00e1n una potencia renovable de 59 megavatios pico (MWp). Asimismo, ha anunciado que la empresa prev\u00e9 convocar este a\u00f1o la segunda convocatoria p\u00fablica para la compra de parques solares, despu\u00e9s de que la primera, lanzada en julio, se haya completado con la adquisici\u00f3n de un parque solar en Vidreres (La Selva) y con la eventual participaci\u00f3n en un parque solar en Sant Fruit\u00f3s de Bages (El Bages), que se encuentra en fase de an\u00e1lisis.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>La empresa p\u00fablica de renovables ya abastece a todos los Departamentos de la Generalitat. La compa\u00f1\u00eda prev\u00e9 multiplicar por diez la energ\u00eda suministrada a la Administraci\u00f3n este a\u00f1o. L\u2019Energ\u00e8tica empieza el a\u00f1o alcanzando los 4.000 puntos de suministro gestionados en el conjunto de la Administraci\u00f3n, con la incorporaci\u00f3n de todos los Departamentos de la Generalitat [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1528,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2],"tags":[],"class_list":["post-1527","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-sin-categorizar"],"acf":[],"uagb_featured_image_src":{"full":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/e3f692e4b59dac11ed9d19228553cb46.jpeg",1920,1080,false],"thumbnail":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/e3f692e4b59dac11ed9d19228553cb46-150x150.jpeg",150,150,true],"medium":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/e3f692e4b59dac11ed9d19228553cb46-300x169.jpeg",300,169,true],"medium_large":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/e3f692e4b59dac11ed9d19228553cb46-768x432.jpeg",768,432,true],"large":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/e3f692e4b59dac11ed9d19228553cb46-1024x576.jpeg",960,540,true],"1536x1536":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/e3f692e4b59dac11ed9d19228553cb46-1536x864.jpeg",1536,864,true],"2048x2048":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/e3f692e4b59dac11ed9d19228553cb46.jpeg",1920,1080,false],"gform-image-choice-sm":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/e3f692e4b59dac11ed9d19228553cb46.jpeg",300,169,false],"gform-image-choice-md":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/e3f692e4b59dac11ed9d19228553cb46.jpeg",400,225,false],"gform-image-choice-lg":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/e3f692e4b59dac11ed9d19228553cb46.jpeg",600,338,false]},"uagb_author_info":{"display_name":"Utrans","author_link":"https:\/\/lenergeticawp.utrans.global\/es\/actualitat\/author\/utrans\/"},"uagb_comment_info":0,"uagb_excerpt":"La empresa p\u00fablica de renovables ya abastece a todos los Departamentos de la Generalitat. La compa\u00f1\u00eda prev\u00e9 multiplicar por diez la energ\u00eda suministrada a la Administraci\u00f3n este a\u00f1o. L\u2019Energ\u00e8tica empieza el a\u00f1o alcanzando los 4.000 puntos de suministro gestionados en el conjunto de la Administraci\u00f3n, con la incorporaci\u00f3n de todos los Departamentos de la Generalitat&hellip;","_links":{"self":[{"href":"https:\/\/lenergeticawp.utrans.global\/es\/wp-json\/wp\/v2\/posts\/1527","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lenergeticawp.utrans.global\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lenergeticawp.utrans.global\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lenergeticawp.utrans.global\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/lenergeticawp.utrans.global\/es\/wp-json\/wp\/v2\/comments?post=1527"}],"version-history":[{"count":0,"href":"https:\/\/lenergeticawp.utrans.global\/es\/wp-json\/wp\/v2\/posts\/1527\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lenergeticawp.utrans.global\/es\/wp-json\/wp\/v2\/media\/1528"}],"wp:attachment":[{"href":"https:\/\/lenergeticawp.utrans.global\/es\/wp-json\/wp\/v2\/media?parent=1527"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lenergeticawp.utrans.global\/es\/wp-json\/wp\/v2\/categories?post=1527"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lenergeticawp.utrans.global\/es\/wp-json\/wp\/v2\/tags?post=1527"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}