{"id":1602,"date":"2025-12-16T00:00:00","date_gmt":"2025-12-15T23:00:00","guid":{"rendered":"https:\/\/lenergeticawp.utrans.global\/actualitat\/lenergetica-sumara-113-mwp-de-potencia-renovable-a-traves-del-parque-solar-de-els-valentins\/"},"modified":"2025-12-16T00:00:00","modified_gmt":"2025-12-15T23:00:00","slug":"lenergetica-sumara-113-mwp-de-potencia-renovable-a-traves-del-parque-solar-de-els-valentins","status":"publish","type":"post","link":"https:\/\/lenergeticawp.utrans.global\/es\/actualitat\/lenergetica-sumara-113-mwp-de-potencia-renovable-a-traves-del-parque-solar-de-els-valentins\/","title":{"rendered":"L\u2019Energ\u00e8tica sumar\u00e1 11,3 MWp de potencia renovable a trav\u00e9s del parque solar de Els Valentins"},"content":{"rendered":"\n<p><strong>La instalaci\u00f3n fotovoltaica, que se situar\u00e1 como la segunda m\u00e1s grande de Catalu\u00f1a, se convertir\u00e1 en la principal planta de generaci\u00f3n de la empresa p\u00fablica<\/strong><\/p><p><strong>Producir\u00e1 15,4 GWh anuales de energ\u00eda verde, una cantidad similar al consumo anual del Hospital Sant Joan de Reus<\/strong><\/p><p>&nbsp;<\/p><p><strong>El Govern ha autorizado la adquisici\u00f3n por parte de L\u2019Energ\u00e8tica del parque solar fotovoltaico de Els Valentins, situado en el t\u00e9rmino municipal de Ulldecona (Montsi\u00e0). Se trata de una instalaci\u00f3n que tendr\u00e1 una producci\u00f3n anual estimada de 15,4 GWh, una cifra que contribuir\u00e1 de forma significativa al abastecimiento de los servicios p\u00fablicos con energ\u00eda renovable, equivalente al consumo anual de un centro hospitalario de las dimensiones del Sant Joan de Reus.<\/strong><\/p><p>El parque cuenta con 15.990 paneles y dispone actualmente de una potencia de 9,8 MWp (9,6 MW nominales). Se encuentra en fase de pruebas previa a la conexi\u00f3n a la red, prevista para las pr\u00f3ximas semanas, y tiene un proyecto de ampliaci\u00f3n hasta alcanzar los 11,3 MWp.<\/p><p>La operaci\u00f3n de compra de la instalaci\u00f3n y del terreno donde se ubica, a la empresa promotora Eguzki Solarcat SL, se ha acordado por un valor de 2,8 millones de euros, tras superar una auditor\u00eda externa y constatar la aceptaci\u00f3n territorial del proyecto. La formalizaci\u00f3n de la operaci\u00f3n quedar\u00e1 supeditada al cumplimiento de las condiciones t\u00e9cnicas y administrativas habituales en este tipo de transacciones.<\/p><p><strong>Compatibilidad con la actividad agr\u00edcola y ganadera<\/strong><\/p><p>El dise\u00f1o del parque, que ocupa una superficie de 17,7 hect\u00e1reas, ha tenido en cuenta la convivencia con el sector primario. Se ha reservado una zona espec\u00edfica dentro del recinto donde se podr\u00e1 desarrollar actividad agr\u00edcola de forma complementaria al uso energ\u00e9tico, fomentando un modelo de uso del suelo m\u00e1s sostenible y respetuoso con el entorno rural. En otra zona del parque, la generaci\u00f3n de energ\u00eda se compatibilizar\u00e1 con el pastoreo de ganado.<\/p><p><strong>Avanzando hacia la descarbonizaci\u00f3n<\/strong><\/p><p>Esta operaci\u00f3n estrat\u00e9gica se enmarca en la hoja de ruta de L\u2019Energ\u00e8tica para cumplir con el encargo del Govern de descarbonizar todos los servicios p\u00fablicos de la Generalitat de Catalunya en el horizonte de 2040. La adquisici\u00f3n del parque de Els Valentins supone un avance relevante hacia el objetivo de disponer de una potencia de generaci\u00f3n propia de 1.000 MW de energ\u00eda renovable, reduciendo la dependencia del mercado el\u00e9ctrico y garantizando la soberan\u00eda energ\u00e9tica de la Administraci\u00f3n. Adem\u00e1s del abastecimiento de servicios p\u00fablicos, la energ\u00eda producida por el parque tambi\u00e9n servir\u00e1 para suministrar dos puntos de recarga ultrarr\u00e1pida de veh\u00edculos el\u00e9ctricos situados en el n\u00facleo de poblaci\u00f3n de Els Valentins.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>La instalaci\u00f3n fotovoltaica, que se situar\u00e1 como la segunda m\u00e1s grande de Catalu\u00f1a, se convertir\u00e1 en la principal planta de generaci\u00f3n de la empresa p\u00fablica Producir\u00e1 15,4 GWh anuales de energ\u00eda verde, una cantidad similar al consumo anual del Hospital Sant Joan de Reus &nbsp; El Govern ha autorizado la adquisici\u00f3n por parte de L\u2019Energ\u00e8tica [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1603,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2],"tags":[],"class_list":["post-1602","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-sin-categorizar"],"acf":[],"uagb_featured_image_src":{"full":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/b962f5dd38bbf30861aac106d8f6a384.png",1799,1350,false],"thumbnail":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/b962f5dd38bbf30861aac106d8f6a384-150x150.png",150,150,true],"medium":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/b962f5dd38bbf30861aac106d8f6a384-300x225.png",300,225,true],"medium_large":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/b962f5dd38bbf30861aac106d8f6a384-768x576.png",768,576,true],"large":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/b962f5dd38bbf30861aac106d8f6a384-1024x768.png",960,720,true],"1536x1536":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/b962f5dd38bbf30861aac106d8f6a384-1536x1153.png",1536,1153,true],"2048x2048":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/b962f5dd38bbf30861aac106d8f6a384.png",1799,1350,false],"gform-image-choice-sm":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/b962f5dd38bbf30861aac106d8f6a384.png",300,225,false],"gform-image-choice-md":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/b962f5dd38bbf30861aac106d8f6a384.png",400,300,false],"gform-image-choice-lg":["https:\/\/lenergeticawp.utrans.global\/wp-content\/uploads\/2026\/06\/b962f5dd38bbf30861aac106d8f6a384.png",600,450,false]},"uagb_author_info":{"display_name":"Utrans","author_link":"https:\/\/lenergeticawp.utrans.global\/es\/actualitat\/author\/utrans\/"},"uagb_comment_info":0,"uagb_excerpt":"La instalaci\u00f3n fotovoltaica, que se situar\u00e1 como la segunda m\u00e1s grande de Catalu\u00f1a, se convertir\u00e1 en la principal planta de generaci\u00f3n de la empresa p\u00fablica Producir\u00e1 15,4 GWh anuales de energ\u00eda verde, una cantidad similar al consumo anual del Hospital Sant Joan de Reus &nbsp; El Govern ha autorizado la adquisici\u00f3n por parte de L\u2019Energ\u00e8tica&hellip;","_links":{"self":[{"href":"https:\/\/lenergeticawp.utrans.global\/es\/wp-json\/wp\/v2\/posts\/1602","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lenergeticawp.utrans.global\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lenergeticawp.utrans.global\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lenergeticawp.utrans.global\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/lenergeticawp.utrans.global\/es\/wp-json\/wp\/v2\/comments?post=1602"}],"version-history":[{"count":0,"href":"https:\/\/lenergeticawp.utrans.global\/es\/wp-json\/wp\/v2\/posts\/1602\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lenergeticawp.utrans.global\/es\/wp-json\/wp\/v2\/media\/1603"}],"wp:attachment":[{"href":"https:\/\/lenergeticawp.utrans.global\/es\/wp-json\/wp\/v2\/media?parent=1602"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lenergeticawp.utrans.global\/es\/wp-json\/wp\/v2\/categories?post=1602"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lenergeticawp.utrans.global\/es\/wp-json\/wp\/v2\/tags?post=1602"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}